Indiana + San Jose · 18 to 24 days

Trade portalOrder $35 sample proof box

Purl & StitchHeavy-stitch apparel studio

Direct pricing

Delivered pricing, 70k to 100k+ stitch math, and production lead times.

Every public price on this site is Direct and comes from the same price file as this table. The 48-piece column is the card price. The 5R trade net is on the trade program.

Direct

The public price for brands, teams, and companies buying for themselves.

Direct by quantity
Style24 pcs25 pcs36 pcs48 pcs · card72 pcs144 pcs288 pcs
Value Fleece280–320 GSM fleece$42.00—$38.75$36.50$34.25$31.50$29.00
Heavyweight Fleece420–450 GSM fleece$56.00—$52.00$49.00$46.00$42.00$39.00
Boxy Tee240–280 GSM cotton jersey——$24.00$21.50$20.00$18.50$17.20
Duck Workwear Jacket12–14 oz cotton duck—$79.48$74.00$69.00$65.00$60.00$56.00
Structured 3D Puff CapStructured cotton twill, buckram crown——$19.00$17.00$15.80$14.50$13.50
Canvas Boat Tote18 oz cotton canvas——$26.00$23.50$22.00$20.00$18.50

Shaded cells are the 48-piece Direct price on the product cards: from, at 48 pcs. A dash means that quantity is below the style minimum.

Included

  • The garment in a stock shade.
  • Up to 70,000 stitches.
  • Delivery in the United States.
  • Artwork review and production sign-off on days 2–6.
  • Sizes S–XL.

Not included

  • We do not include a complimentary digital proof or strike-off.
  • A stitched sample of your own artwork. Ask and we will quote it.
  • Delivery outside the U.S.
  • A date inside 18 days, unless we confirm it on the quote.
  • Card payment for the sample box. That request gets a payment link.

Direct step-ups

  • 100,000+ stitch tier$1.50 / pc
  • Chenille lettering or patch$4.50 / pc
  • 3D puff$3.50 / pc
  • Sewn-in woven neck label$1.25 / pc
  • Secondary placement (sleeve or back)$4.00 / pc
  • Frosted zip polybag + size sticker$0.65 / pc
  • 2XL$2.00 / pc
  • 3XL$3.00 / pc

Front 3D puff is already in the structured cap price, so that adder does not stack on caps.

Close-up of dense gold embroidery on black fleece.
Heavy satin stitch on fleece. The sample box lets you check the backing in person.

Lead times

Standard orders are 18 to 24 days. Planned bulk of 144 pieces or more is 7 to 8 weeks. The sample box ships in 1 to 2 days from Indiana and is not a production order.

  1. Day 0–1

    Locked delivered quote

    Style, quantity, color, ship-to, and the delivered price are confirmed before anything is cut.

  2. Day 2–6

    Artwork review and production sign-off

    You sign off on the production plan. This step is not a complimentary strike-off and not a free photo proof.

  3. Day 7–15

    Panel-first cut and sew

    Stock fabrics are cut and sewn, then the heavy stitch goes on.

  4. Day 16–19

    AQL 2.5 inspection and staging

    We inspect to AQL 2.5 and stage the exact quantity on the purchase order.

  5. Day 20–24

    U.S. door or blind delivery

    Standard orders land in this window. Say so if the cartons should ship blind. Runs of 144 pieces or more move to a 7 to 8 week calendar.